Your present location:Home >> News Center >> News >> Chinese 22mcc group bid Shandong Rizhao steel base project No. 1 500 sintering project

Font Size:big  middle  small

Chinese 22mcc group bid Shandong Rizhao steel base project No. 1 500 sintering project

Writer:Wang HouliangSource:Group Party committe Number of visits: Date:2015-12-16

 

In December 15th, the China 22mcc group Shandong iron and Steel Group Co. Ltd. Rizhao steel base project No. 1 500 sintering project.
This project is located in Arashiyama Industrial Park in Rizhao City District of Shandong Province, the construction general contracting, construction includes 1 No. 500 flat sintering engineering and within the red line of public public assistance project, mainly including No. 1 and No. 1 sintering cooling system of main building, No. 1, No. 1 electric dust collector at the head of main fan, ingredients room, warehouse, fuel chamber, fuel crushing, mixing machine, circulating water pump room, screening room, transfer station, beltcorridor waste heat power generation and supporting three, civil engineering, and auxiliary facilities, the duration is 540 calendar days.

TypeInfo: News

Keywords for the information: